Home > Operational Area > WATER TREATMENT
Valveless Filtering Pond Operation and Maintenance

1. The valves on the access pipeline shall be fully opened to make the load of each filter pond be equal.
2. Flushing : Each filter pond shall be forced-flushed once in a day, the operation is as follows:
Open the forced-flushing water valve, close the anti-siphon valve, close the forced-flushing valve after the siphon is formed for flushing.Align the conical baffle to make the flushing time within 5 to 7 min. The backflushing intensity shall be controlled to the maximum flow when the fine sand can not run out.  After flushing, open the anti-siphon valve for operation.

Favourite