Home > Operational Area > BOILER
Treatment on Priming

1. The combustion ratio shall be reduced and the unit operating load shall be lowered.
2. The continuous –blowdown valve of the boiler drum shall be opened wider, and when necessary, the periodic blow down valve of the boiler drum shall be opened.
3. If the steam temperature decreases sharply, open the main steam pipe to drain the water. In case the temperature of main steam at the steam turbine side decreases by 50℃ within 10 minutes or plummets by 50℃, the steam turbine shall be stopped immediately.
4. The water treatment department shall be informed to highlight the analysis on the boiler water.

Favourite