The Work to be Accomplished by Thermal Control Discipline Before the Oil Pipeline of Steam Turbine is Installed

1.Before the oil system pipe is pickled, the temperature and pressure tapping sockets shall be installed.

2.Before the oil of oil system pipe circulates, the temperature-measuring components, the installation of pressure tapping parts and tapping valves must be finished. The installation of instrument pipeline shall be finished and has been connected with the instrument valve. 