steam turbine at the start, stop and during operation, the size of differential expansion is associate with the following factors:
⑴ When starting the unit, the cylinders and flanges use improper means to vote, too large or too small steam heating.
⑵ warm-up process, the rate rise too fast or too short warm-up time.
⑶when normal shutdown or sliding - parameter shutdown, steam temperature drops too fast.
⑷ the load increase too fast.
⑸ afterload rejection, empty load or low-load operation for too long.
⑹ turbine water impact occurs.
⑺ during normal operation, the steam parameters change too fast