It means that part of the boiler water is periodically drained from the minimum point of the boiler water circulating system( for example, from the lower connecting boxes under the water-cooled wall), it is required the blowdown time shall be short and blowdown flow shall be big, so that the boiler water fluctuates greatly, thus beneficiating the water dregs to rise up and to be drained.