Home > Operational Area > ELECTRICAL & DCS
Measures for Verifying Coal Feeder

1.Close the electrically operated gate at the inlet of the coal feeder.

2.Empty the coal on the belt conveyer of coal feeder.

3.Stop the coal feeder.

4.Stop the coal mill.

5.Close the electrically operated gate at the outlet of the coal feeder.

6.Turn on the power for the coal feeder.

7.Close the sealing damper of the coal feeder. 


Favourite