The following measures can be taken according to the unit case:
⑴select the appropriate red switch parameters.
⑵develop appropriate temperature and pressure curves.
⑶promptly use cylinders, flanges heater for controlling the temperature difference of the metal components within a predetermined range.
⑷speed control increases the speed and fixed speed warm-up time, after-load, according to the master cylinder temperature rise load speed.
⑸timely adjustment vacuum when warming punch machines.
⑹Bearing seal steam supply using appropriate and timely adjustments.